For months after Hurricane María we were there ready to lead. Crews came from around the nation. Their mission was to help restore Puerto Rico's electrical grid as quickly as possible. Lord Electric was there, putting their history and expertise into action, helping with logistics. Over hillsides, through landslides, carefully maneuvering between natural and fabricated debris, LORD had already been there before after Hurricanes Georges (1998) and Hugo (1990). As a trusted contractor of the Puerto Rico Power Authority (PREPA), LORD also new the history and limitations of the electrical grid. With all the expert hands working together it took nearly 10 months to bring the grid back to 98% operation. We share a video with images of our time working from dawn til dusk to bring power and light back to Puerto Rico.